The Formosa 1 Offshore Wind Farms is the first offshore wind farm installed in Taiwan. It is one of the first two projects that has been approved under the “Grand Scheme” of the Taiwanese government to promote offshore wind power. The project consists of two mandatory phases:
a demonstration phase with 2 wind turbines and the commercial phase. In total the project will be approximately 130MW of installed capacity.

Client Swancor Renewable Energy
Year 2013-2017
Services
O&M計画・戦略
調達&契約​
基本設計&詳細設計
インターフェースマネジメント
+3

Overview

Location
Miaoli county, Taiwan
Project
Formosa 1 Offshore Wind Farm
Capacity
130 MW
WTG Model
Siemens SWT 4.0-120 + TBD

The site is approximately 10km from shore in Miaoli county, Taiwan, and thus has no offshore high voltage station. The power is directly lead from the wind turbines to the onshore transformer station.

November 2016, the installation of the first two Siemens SWT 4.0 wind turbines has been completed by Siemens, using the installation vessel Torben, which also performed the foundation installations.

A major challenge in Taiwan, was the absence of suitable wind turbine installation vessels in the immediate area and limitations to use vessels from China.

Involvement

Financial modelling
Turbine Procurement
Electrical Design
Installation Vessel Tender
O&M Strategy Development
Contract Negotiations
Interface Matrix

IX has been involved with the project since 2013. Initially the role was technical and commercial advisor on the wind turbines selection and tender. Following, IX was appointed advisor for:
Technology Evaluation / screening.

During the feasibility stage of the project, IX was involved with evaluating the various wind turbine technologies as well as screening potential installation vessel suppliers.

Open job positions
  • Open application Full-time
  • Senior Project Engineer (design) Full-time Leiden
  • Project Engineer T&I Full-time Taipei office
  • Package Lead ONS Full-time / Part-time Taipei office
  • Stakeholder Manager Full-time Taipei office
  • HR Officer Full-time / Part-time Leiden
  • Procurement Manager Full-time Leiden
  • Senior Business Development (offshore wind) Full-time Leiden
  • Permit & Consent Coordinator Full-time Taipei office
  • QHSE Manager Full-time Leiden
  • Package Lead Wind Turbine Generator Full-time Taipei office
  • Community Relations and Permit Manager Full-time Taipei office
  • Package Lead Offshore Substation Full-time Taipei office
  • Package Lead Cables Full-time Taipei office
  • Contract Manager Full-time Taipei office
お問い合わせ
Select your field of interest