Back Projects

Windplanblauw

Client SwifterwinT & Vattenfall
Year 2018-2024
Services
Permitting

Overview

Location / COD
Flevoland, The Netherlands / 2024
Developer
SwifterwinT & Vattenfall
WTG Model
37 x V162-5.6 & 24 Cypress-5.5
Capacity
340 MW
Role
Permitting, GIS, Archeology
Services
Coordinate multiple permitting procedures and permit management
Development of ‘Archaeological Masterplan’ and management of the field surveys
GIS (Geographic Information System)

Windplanblauw is a replacement of 74 turbines, mixed on- and offshore. It is part of a regional plan to reorganize and further develop wind power in the province of Flevoland. The northern project area is developed by Vattenfall and SwifterwinT. 61 more efficient turbines have been built, quadrupling the wind farm’s capacity and thus providing wind power to an equivalent of 400.000 households.

IX has successfully supported our team with regards to the implementation of permit requirements. An important aspect is coming coming to agreement with proper authorities on the execution of archaeological baseline studies. IX was very valuable in making this happen.

Steef van Baalen Senior Projectmanager at SwifterwinT

Curious about our services and possibilities? Please contact Tom van der Linde.

Open job positions
  • Open application Full-time
  • senior Project Engineer (design) Full-time Leiden
  • Interface Manager Offshore Wind Full-time Taipei office
  • Project Engineer T&I Full-time Taipei office
  • Commissioning Engineer Full-time Leiden
  • Package Lead ONS Part-time Taipei office
  • Stakeholder Manager Full-time Taipei office
  • EIA Manager Full-time Taipei office
  • HR Officer Full-time / Part-time Leiden
Contact

Contact

Select your field of interest